Date Needed By: 08/31/2024
Contact Name: CATHOLIC CENTRAL HIGH SCHOOL OF BURLINGTON INC
Delivery Option: Needs to be Delivered
Details on what is needed:CCHS is requesting building materials needed to replace the roof on our MAC building. The roof is in very poor condition and needs to be replaced as soon as possible. We received multiple estimates for the project that include both materials and labor. The estimates range from roughly $35,000-$65,000 depending on the vendor. The roof size is approximately 50’x 45’ and the estimates include the following items: - Removal of existing rubber roofing material - Installation of plywood, insulation board, and roofing tape - Application of flashing to pipes, heating units & drain as needed