Powered by CharityEZ

CATHOLIC CENTRAL HIGH SCHOOL OF BURLINGTON INC

(262) 763-1518

Roof Replacement

Building Materials and Tools

Date Needed By: 08/31/2024

Contact Name: CATHOLIC CENTRAL HIGH SCHOOL OF BURLINGTON INC

Delivery Option: Needs to be Delivered

Details on what is needed:CCHS is requesting building materials needed to replace the roof on our MAC building. The roof is in very poor condition and needs to be replaced as soon as possible. We received multiple estimates for the project that include both materials and labor. The estimates range from roughly $35,000-$65,000 depending on the vendor. The roof size is approximately 50’x 45’ and the estimates include the following items: - Removal of existing rubber roofing material - Installation of plywood, insulation board, and roofing tape - Application of flashing to pipes, heating units & drain as needed

Building Materials and Tools

(Urgent Priority)

More Needs

Furniture

CATHOLIC CENTRAL HIGH SCHOOL OF BURLINGTON INC

  • Burlington, WI

  • 262-763-1518